Recent Projects June 2017

Recent Projects

containersFiltering more than dredged water from Victoria Harbour

Esquimalt Harbour, Victoria, BC, Feb 2017

The historic Esquimalt, Victoria, BC harbour is being cleaned up. Dredged bottom silt brought up is high in heavy metals such as lead and cadmium, as well as the detritus of a hundred+ year old military and shipping base. BI Pure Water designed a prefilter/ultra/nano filtration system that worked well to remove up to 99% of the heavy metals from dredged water in order to meet the extremely stringent BC Marine Aquatic water quality standards. They are among the highest effluent treatment standards in the world.

Commissioning of the system was in fact shut down for a short period as dredging pulled up a four foot live artillery shell. Other objects such as cannon balls, human bones and historical artifacts are being examined and catalogued by archeologists. /p>

new

Pumphouses for new Rankin Inlet gold mine move mine waste

Rankin Inlet, Nunavut, June 2017

Pumping stations for very large flows of 4000GPM are designed to deliver water between tailings ponds for a new gold mine near Rankin Inlet, Nunavut. The pumphouses were designed and built in BI Pure Water’s factory in April/May and delivered in June.

newPumping water up the Vernon Hill

Vernon, BC, June 2017

City water will be piped to the first of two pumphouses at lower elevation then delivered to 622 meters to a new subdivision in Vernon with incredible views. BI Pure assisted KWL in the design of Grundfos pumps at 107 USGPM to deliver the water; in the second pumphouse the chlorine content is assessed and boosted as needed by a BI Pure Water chlorinator, before distribution to homes. Care is taken to preserve the quality of Vernon city water. BI Pure Water delayed the delivery of the pumphouses until late June as the municipality is managing extreme spring flooding issues.

newNunavut capital receives new fire pump house

Iqaluit, Nunavut, June 2017

A fire pump housed in a steel frame building was shipped complete to Nunavut to fit in snugly beside the water treatment plant and provide emergency water supply to the energy building. BI Pure Water made design provisions for testing of the water supply all year in extremely cold temps. The Clarke diesel pump with battery backup power is capable of delivering 1500 US gpm at 75 psi.